![]() Accordingly, as per Section 240.24(D), no storage is permitted inside and a sign stating that shall be posted on the door. However, a 2 feet deep niche with a door is considered a closet. If we would specify that a sign be mounted on the panelboard reading "Do Not Work on Panelboard With Niche Door Closed", would this installation be acceptable? When the door is open, the clearance in front of the panelboard would be 10 feet. The niche is 3 feet and 4 inches wide, 6½ feet high and has a door. We are considering installing a panelboard in a 2 feet deep niche.Is the entrance to the room allowed to be through an adjoining Mechanical Room? If he length of the Service End Box is greater than 6 feet, is a 3 feet front clearance required for the entire length of the box? Is more than 3 feet clearance required in front of the Service End Box?.The Service End Box will be located at grade level within a dedicated room, with one door and no other equipment inside. Due to space constraints, the electrical service distribution will be located on the 2nd floor. There will be no cellar within the building. The electrical service is anticipated to be sized at 4,000A, 120/208V. We are designing an apartment building with approximately 150 residential units along with commercial space. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |